[1]
Margono, M. et al. 2024. Implementation of solar cell booster to prevent damage to the electrical system and overcome CA N’T-Start Problems on PC2000-8 Units at PT PPA Jobsite Borneo Indobara. Gema Wiralodra. 15, 1 (Apr. 2024), 585–595. DOI:https://doi.org/10.31943/gw.v15i1.679.