[1]
Prihantini, A. et al. 2026. Performance Comparison of the Driller’s Method and Wait and Weight Method for Effective Well Kick Management of Rig AAM#18 ZJ70DBS 2000 HP. Gema Wiralodra. 16, 3 (Feb. 2026), 483–490. DOI:https://doi.org/10.31943/gw.v16i3.878.