Margono, M. (2024) “Implementation of solar cell booster to prevent damage to the electrical system and overcome CA N’T-Start Problems on PC2000-8 Units at PT PPA Jobsite Borneo Indobara”, Gema Wiralodra, 15(1), pp. 585–595. doi: 10.31943/gw.v15i1.679.